Compare storyboard versions and resolve slide feedback
Compare shorter and longer storyboards, select the version you want to build, and track unresolved items on a draft slide.
Compare a shorter or longer storyboard#
In the Storyboard view, Length shows how many slides the saved storyboard has. Shorter asks Studio for a version with fewer slides and Longer for a version with more. Each version is a separate proposal next to your storyboard: the storyboard changes only when you select a version, and every version stays listed until you select or discard it.
Shorter and Longer start from the saved slide titles, purpose, content and selected source links. Studio keeps source-review status separate from the proposed wording. A length variant does not verify its sources; review the wording and linked material before selecting it.
A storyboard message is one slide’s title, purpose, content direction and uncertainties. Studio does not record which wording you typed, so it treats every saved message as yours and lists every message a version leaves out. Studio works out the comparison itself by matching slides; it does not rely on the AI’s description of what changed.
- Save or discard any storyboard edits first. A version always starts from the saved storyboard, so Shorter and Longer stay unavailable while you have unsaved edits.
- Choose Shorter or Longer. Review the saved app files notice that appears in Length, then choose Allow saved app files for this request, or Cancel request to send nothing. Each request uses one AI text generation.
- Follow the request in the proposal list: it shows Queued, then Writing…. To end it early, choose Stop. While Studio confirms an outcome the request shows Confirming the result…; a stopped request is then listed as Stopped. The Builder conversation also shows the request.
- When the version shows Ready to compare, choose Compare. Omitted lists each saved message the version leaves out with its full text. Merged shows a proposed slide that combines saved slides, with each saved slide in full. Added lists new slides. Reworded, shown only when needed, puts the saved wording of a kept slide next to the proposed wording.
- Read the lists, then choose Select this version. Studio saves it as the storyboard at the saved revision. The storyboard you had is listed as Previous storyboard; compare it and choose Restore this storyboard to put it back.
- Choose Discard on any proposal you no longer need. Discarding removes only that proposal from the list and does not change the storyboard.
If Shorter or Longer cannot produce a usable version, the saved storyboard stays unchanged. When Studio recorded the failed check, your request in Length shows a specific reason, for example The proposed version did not have fewer slides than the saved storyboard, or Studio could not use the returned slide structure. When no reason was recorded, including older failed requests, the list keeps the generic Studio could not produce this version message; it does not explain why the request failed.
Your failed request may also show Usage was recorded for this request, Usage was not charged to this request, or Usage could not be confirmed. Recorded usage and unconfirmed usage are different outcomes; read the message shown for that request. If no usage message appears, Length does not confirm whether usage was recorded.
When the storyboard changes after a version was made, for example after you edit it or select another version, that version shows Storyboard changed · read only. You can still compare and discard it, but you cannot select it, because its comparison describes a storyboard you no longer have. Restoring the storyboard it was made from makes it selectable again.
Resolve storyboard items on a draft slide#
A saved storyboard can list uncertainties and claim references for each slide. When a slide in a generated storyboard or Shorter or Longer proposal uses evidence with a recorded disagreement, Studio adds an unresolved notice to that slide. Review the notice under Needs verification. After Studio builds a CLM draft from the storyboard, Edit shows them under the slide built from that storyboard slide, so you can check them where they apply.
To build that draft, ask Builder to create or rebuild the whole presentation. Studio sends the saved storyboard with your request as planning data, not as instructions, and asks for one slide per storyboard slide in the same order. The Builder conversation shows only your own message. A request on a presentation with a saved storyboard that earlier ended as failed after its time limit now starts when you send it again.
- Open the presentation in Edit and select a slide. Under the slide, Storyboard items names the storyboard slide it came from and lists each open item as Needs verification or Claim reference · unverified.
- Check the item against the intended source and its scientific context, and change the slide wording yourself if needed.
- Choose Mark resolved. The status confirms the saved change and the item moves under Marked resolved. Studio does not verify the item; the saved record states only that an author marked it resolved.
- To return an item to the open list, open Marked resolved and choose Reopen.
When the draft has a different number of slides from the storyboard, every slide lists the items by storyboard slide instead of placing them on one slide. A changed storyboard plan, slide wording or source selection reopens that slide’s reviewed items. If you see a message about an earlier resolution, check the wording and selected sources and mark each item resolved again. In Builder, Source ledger & plan shows recorded storyboard input for the run when available. Use the Storyboard view to see the current plan and its review decisions.
Check the selected storyboard and recover an interrupted change#
- After a confirmed save and reload, a storyboard item you marked resolved stays under Marked resolved on its slide, and the remaining items stay open. Marking an item resolved does not change the slide or verify its content.
- After you select a storyboard version and the storyboard reloads, Storyboard shows the selected slides, Previous storyboard is listed as Ready to compare, and versions made from the earlier storyboard show Storyboard changed · read only until you discard them or restore that storyboard.
In Builder’s Storyboard view, choose Shorter or Longer once under Length, then follow that version’s saved progress in the list. If the request response could not be confirmed, choose Check saved requests or reload to look for the same request and its saved progress before asking again. Studio does not send it again automatically. Use Compare to review a ready version. Your saved storyboard stays unchanged until you choose Select this version.
- Storyboard items reports that the project changed: nothing was resolved. Review the reloaded items and choose Mark resolved again if the item is still open.
- A storyboard resolution is not confirmed: choose Check saved result. It repeats the same request, so the change is never saved twice; other storyboard items stay unavailable until it is confirmed.
- A storyboard version cannot be selected because the project changed: nothing was selected. Reload the storyboard, compare the version again and choose Select this version if it is still Ready to compare.
- A storyboard version selection or discard is not confirmed: choose the same action again. It repeats the same request, so it is never applied twice.
- A shorter or longer request fails, stops or cannot finish: the saved storyboard is unchanged. Read any displayed reason and usage message before deciding whether to discard the request and choose Shorter or Longer again. Older failures without a recorded reason keep Studio could not produce this version.